Ankara · Düsseldorf

+90 (850) 441 14 13

All projects

Eskişehir ESS

A pioneering storage installation for Osmangazi Elektrik Dağıtım within Türkiye’s first storage R&D project KEDEP

Location
Eskişehir, Türkiye
Client
OEDAŞ
Year
2021

Before energy storage became part of Türkiye’s mainstream energy agenda, a few pioneering projects showed what was possible. The Eskişehir ESS was one of them.

Built in 2021 for Osmangazi Elektrik Dağıtım A.Ş., the system was part of KEDEP, Türkiye’s first energy storage R&D project. iNOVAT delivered it as a turnkey solution, integrating:
✔ LGES battery systems
✔ Sungrow PCS

iNOVAT took the project from engineering and integration through to commissioning. The result was a working example of grid-connected storage on the Osmangazi distribution network.

This was more than an R&D installation. It was an early proof that energy storage could become a real part of Türkiye’s distribution grids, and a first step on the path that now reaches more than 2 GWh of installed capacity with iNOVAT and PowerKonnekt.

More projects.